Incinerator Request

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial installation, commissioning and operational training under the supervision of the manufacturer’s technician. The incinerator is to be maintained and operated to manufacturer’s specifications by trained personnel. Contractor must have sufficient personnel trained and competent to operate the incinerator throughout the contract period. Specifications for the incinerator are attached in Appendix A. Incinerator Use/Ash Collection Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be incinerated. All ash will be collected and stored in individual storage bins for each particular waste stream. The bins are to be provided by the contractor to the same design as the storage bins for the raw waste streams and include a lid design that prevents contamination from water. Ash from each waste stream will be sent for laboratory analysis after each initial incineration by the Company and at intervals decided by the Company thereafter. Contractor will be required to collect ash samples for analysis as directed by the Company. The Contractor will be responsible for the security of samples taken to prevent contamination until collection by the Company or designated courier. Ash will be disposed of at the direction of the Company. It is the responsibility of the Contractor to ensure the ash is not compromised until final disposal. Company will provide additional storage area for ash if and as required.

Mobile Incinerator Burn Rate 50kg/h minimum

Mobile Incinerator Burn Rate 50kg/h minimumBurn Rate 50kg/h minimumWeight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 850 °C, please indicateOne year Spare Parts Package for complete maintainabilityBurn Rate 100kg/h minimumWeight (kg), please indicate:Secondary Chamber Gas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 850 °C, please indicateBurn Rate 100kg/h minimumWeight (kg), please indicate:Secondary ChamberGas Retention Time – 2 SecondsFuel – Diesel/LPG/LNG, please indicatePower Supply for Control Box – 220V-240V 50Hz single phaseMinimum operating temperature 1200 °C, please indicateOne year Spare Parts Package for complete maintainability

1 No. in Primary Chamber and 1No. in Secondary Chamber

No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.

Medical Incinerator 30 kg/hr Burn Capacity minimum

Price for TS-100/2 incinerator or equivalent, capable of 2 yrs of operation.  Include cost of all spares and equipment required for maintenance.SHIPPING and HANDLING COST FOB Erbil,44001,IRAQPrice for one skid mounted Sure-fire TS-150/2 incinerator or equivalent capable of 2 yrs of operation.  Include cost of all spares and equipment required for maintenance.SHIPPING and HANDLING COST FOB Erbil,44001,IRAQMedical Incinerator 18.75 kg/hr  Burn Capacity  minimum (min. 75 kgs. Waste Feed Capacity per day if 4 hours operation) (Power Supply 380V, 50Hz, 3Ph)Medical Incinerator 30  kg/hr  Burn Capacity  minimum (min. 120 kgs. Waste Feed Capacity per day if 4 hours operation) (Power Supply 380V, 50Hz, 3Ph)1.2 Spare Parts (For 75 kgs Waste Feed Capacity) (Note: All spare parts for one (1) year usage)Incinerator main unit main body (primary chamber, secondary chamber, mix-combustion chamberFilter ChamberChimneyPLC PanelOil TankCombustion burnerWind TubeOil TubeFilter brickAsh clean toolBlowerFurnace gateOne bag chamber maintenance materialOthers (please specify: if any   )1.3 Spare Parts (For 120 kgs Waste Feed Capacity) (Note: All spare parts for one (1) year usage)Incinerator main unit main body (primary chamber, secondary chamber, mix-combustion chamberFilter ChamberChimneyPLC PanelOil TankCombustion burnerWind TubeOil TubeFilter brickAsh clean toolBlowerFurnace gateOne bag chamber maintenance material

Technical specification for burning incinerator machine

17.The primary burning room  should have at least 2 burners. 18.The secondary burning room should have one burner. 19.  Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for maintenance. 20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank should have capacity of 1000  lt and should be fixed to the system and provided with water level indicator. 21.Each system should have special technology for separating waist products and humidity after gas processing. 22.Each system should have cooling capability after operation. 23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust system should be 1000 mm.  The exhaust pipe should be 6 mm and should be provide with heat insulator.  The exhaust system should be provided with pressure indicator. It  should also provide with ladder and Lightning Arrestor. 24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP. 25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The control panel should  show at least temperature in both the primary and secondary rooms and injectors of the filters and load.    26.Each system should be provided with alarm system for any breakdown or defect of any component of the system. 27.The following personal protective tools must be provide: a.Heat resistant garments for 20 persons. b.Heat resistant goggles for 20 persons. 28.All components of each system should be painted with silver color that is heat resistant.

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2                                                             Spare part list – After burners                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2 Spare part list – Ram loader                           Item description                   N0 of required                         Reed switch                               4                        Seal kit                                       1      Medical waste incinerator Accessories  – Clean out tools – Loading and ash removal methods.      – Fuel storage tank with the two pump and all accessories.  – Flue gas cleaning system – Stack discharge. –      Medical waste incinerator civil work – Construct incinerator foundation     – Provide stack support     – Provide open steel structure room for the incinerator.     Medical waste incinerator submittal shall include:- -Detail installation drawing – Incinerator and auxiliary product data      – Test reports      – Certificates like CE, ISO, LR, AFNOR, TUV and UL.      – Energy analysis report …

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii.  Secondary chamber 2 seconds @ 850°C   The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel  sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate  insulation and a hot face combination of super duty brickwork or high strength castable.   The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.   One Manual Load Incinerator comprising:   •         Manual Loading door …

Evaluation of Vendor offer for Solid Sludge Waste Incinerator

Square Textiles Division Evaluation of Vendor offer for Solid Sludge Waste Incinerator  Criteria Our Requirement Vendor Brand/Manufacturer Nanjing Clover Local Agent N/A Country of Origin China Offer Reference 2016072701N211 Technical Details Model of Incenarator WS-100 Capacity 100 Kg/Hr Type of Waste Used “1. Sludge of ETP 2. Waste Fabric and Yarn 3. Kitchen Waste (includes dry objects and polythene bags) 4. Paper/Carton 5. Spinning Mill AC dust/ Micro Dust” Line Diagram PCC-SCC-Chimney-Water Tank-Spray Scrubber-Fog & Water Separator-ID System-Chimney No of Combustion Chamber 2 2 Temperature Range at PCC 800 C 800°C-1000°C Temperature Range at SCC 1000 C 1000°C-1200°C Useful Life of Incinerator 10 Years Operating Hour/Day Continuous (24 Hours) 16 Total Power Consumption (KW) Space Requirement for the plant (L x W x H) …

INCINERATOR QUESTIONNAIRE

1. Type of waste: Trash   2. Any other type: 3. Quantity of waste generated per day in kg: (50 Ton per day) SOW 4. Duration – incinerator will be used per day: (Minimum 12 hours) SOW 5. Approximate moisture content:  6. Local incinerator operating and emission standards: US-EPA  7. What is the height of the chimney required: Not known 8. Fuel proposed to be used: Deiseal Oil  9. Availability of power and type: 220 or 110  10. Details of space available: Plenty of space  11. Do you require an automatic loading system:  Yes   No  12. Do you require a gas scrubbing system:  Yes   No  13. How soon do you require the system to be delivered: 30  14. Any other specific requirements: 15. Nature: (Solid/Semi-solid/Liquid) Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz 

PYROLYTIC incinerator

This incinerator with “PYROLYTIC” combustion must have:  15. A combustion chamber of waste:  * Perfectly tight door for the manual loading of waste.The loading should be Manual, Batch Load,  * A burner of lighting which the use is limited to the ignition of waste.  * Top Loading loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.  * The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and insulates bricks in order to assure a minimum temperature on   the outside sheet metal. * Composition of the refractory; Refractory concrete : . Thickness : ≥100 mm . Nature: 42% of Al203 Insulate in fibrous panels : . Thickness: ≥75 mm Nature: Calcium silicate. * Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.  * Plate of combustion in Carborundum, avoiding the fixing of glass and slags. 16. Load Method: Top Loading  17. A chamber of post combustion of gases  * A burner of combustion of gases,  * A device of injection of air allowing a total recombustion of gases,  * A device of air inlet of cooling of waste gases,  * A sheath of evacuation of the gases burnt.  * Carcass in strong sheet steel with support of connection.  * Composition of the refractory; Refractory concrete : Thickness : ≥180 mm Nature: 65% of Al203 Insulate in fibrous panel : Thickness: ≥85 mm  Nature: Calcium * Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.  * A secondary injection of air to ensure perfect oxygen content.  18. A control box ensuring the complete cycle of combustion.  19. Fan:  * Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.  20. Controls and regulations:  Control box water tight to dust, including:  * A switch circuit breaker for each engine (ventilators and burners).  * A timer with adjustable temporization for the regulation of each burner.  * A regulator with digital watching for the temperature of combustion.  * A regulator with digital watching for the temperature of postcombustion.  …