eblogs Archive

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii.  Secondary chamber 2 seconds @ 850°C   The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel  sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate  insulation and a hot face combination of super duty brickwork or high strength castable.   The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.   One Manual Load Incinerator comprising:   •         Manual Loading door …

Medical Incinerator 30 kg/hr Burn Capacity minimum

Price for TS-100/2 incinerator or equivalent, capable of 2 yrs of operation.  Include cost of all spares and equipment required for maintenance.SHIPPING and HANDLING COST FOB Erbil,44001,IRAQPrice for one skid mounted Sure-fire TS-150/2 incinerator or equivalent capable of 2 yrs of operation.  Include cost of all spares and equipment required for maintenance.SHIPPING and HANDLING COST FOB Erbil,44001,IRAQMedical Incinerator 18.75 kg/hr  Burn Capacity  minimum (min. 75 kgs. Waste Feed Capacity per day if 4 hours operation) (Power Supply 380V, 50Hz, 3Ph)Medical Incinerator 30  kg/hr  Burn Capacity  minimum (min. 120 kgs. Waste Feed Capacity per day if 4 hours operation) (Power Supply 380V, 50Hz, 3Ph)1.2 Spare Parts (For 75 kgs Waste Feed Capacity) (Note: All spare parts for one (1) year usage)Incinerator main unit main body (primary chamber, secondary chamber, mix-combustion chamberFilter ChamberChimneyPLC PanelOil TankCombustion burnerWind TubeOil TubeFilter brickAsh clean toolBlowerFurnace gateOne bag chamber maintenance materialOthers (please specify: if any   )1.3 Spare Parts (For 120 kgs Waste Feed Capacity) (Note: All spare parts for one (1) year usage)Incinerator main unit main body (primary chamber, secondary chamber, mix-combustion chamberFilter ChamberChimneyPLC PanelOil TankCombustion burnerWind TubeOil TubeFilter brickAsh clean toolBlowerFurnace gateOne bag chamber maintenance material

One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions : 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Baghouse filter in a circular design, with automatic pulse-jet cleaning system of the filter bags

Baghouse filter in a circular design, with automatic pulse-jet cleaning system of the filter bags Temperature of ashes: 25oC with 60% RH The filter shall operate with compressed air at 2-4 bar Th baghouse filter shall be composed of a top section, filters section and bottom cone Top Section: Execution with flat cover, flanged onto the filter top. Including: Pulse jet cleaning system, clean-air outlet, and tube sheet. The filter bags are cleaned in rows by means of detachable blast pipes with high-efficient jet nozzles. Clean-air outlet. Tube sheet for installation of bags between dust- and clean-air chamber. Electronic differential pressure gauge, indicating the differential pressure across the filter bags. Electronic differential pressure control for jet pulsing at dP demand. Pneumatic Control Compressed-air receiver with solenoid valves (IP65). Filter regulator with automatic water separator and drain cock incl. fittings for mounting on the compressed-air receiver. Filter Chamber, including:  Inlet at the top of the chamber (for down-flow filtration) and inspection door. Filter Cages: The filter cages are manufactured of 5 mm round-bar steel, with shaped sheet bottom, and top with a circlip ensuring a quick mounting Filter Bags: Filter bags with a sewn-in bottom and a stainless snap ring for fastening. Filter bags material to be PTFE or Polypropylene to withstand corrosive ashes  A spare set of filter bags to be quoted with the complete system Bottom Cone, below filter chamber Including cleaning door and supporting brackets on cone Safety switch on inspection doors Support frame for outdoor installation Service platform, for positioning by inspection door, with handrail and access through the bottom. With ladder. Rotary valve,  ATEX (inside/outside) Zone 20/Zone 22 Pressure-shock resistance (Explosion): 2 bars With a Centrifugal fan: duty point of 2,000 cfm at 2700 Pa All installation to be outdoor: IP rating for any electrical to be for outdoor installation Power: 230V/1Ph or 380V/3Ph, 50 Hz

VARIOUS TYPES OF INCINERATORS

Primary combustion Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone Secondary combustion Residence time in the secondary chamber not less than 2 seconds Both primary and the secondary temperatures maintained until all the waste has been completely combusted Chimney Chimney with a minimum height of 4 meters above ground level Minimum exit velocity of the emissions not less than 10 metres/second Temperature Warnings Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature General Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height Incinerator model A Burn Rate 65kg/h minimum Weight (kg), please indicate: Secondary Chamber Gas Retention Time – 2 Seconds Fuel – Diesel/LPG/LNG, please indicate Power Supply for Control Box – 220V-240V 50Hz single phase Minimum operating temperature 850 °C, please indicate One year Spare Parts Package for complete maintainability 10m Hose Pipe, indicate length I000 Litre Fuel Tank + Pipe System, indicate volume Additional chimney extension, indicate height Warranty, indicate no of years Incinerator model B Burn Rate 150kg/h minimum Weight (kg), please indicate: Secondary Chamber Gas Retention Time – 2 Seconds Diesel/LPG/LNG, please indicate Power Supply for Control Box- 220V-240V 50Hz single phase Minimum operating temperature 920 °C, please indicate One year Spare Parts Package for complete maintainability 10m Hose Pipe, indicate length I000 Litre Fuel Tank + Pipe System, indicate volume Additional chimney extension, indicate height Warranty, indicate no of years Incinerator model C Burn Rate 250kg/h minimum Weight (kg) please indicate: Secondary Chamber …

Technical specification for burning incinerator machine

17.The primary burning room  should have at least 2 burners. 18.The secondary burning room should have one burner. 19.  Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for maintenance. 20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank should have capacity of 1000  lt and should be fixed to the system and provided with water level indicator. 21.Each system should have special technology for separating waist products and humidity after gas processing. 22.Each system should have cooling capability after operation. 23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust system should be 1000 mm.  The exhaust pipe should be 6 mm and should be provide with heat insulator.  The exhaust system should be provided with pressure indicator. It  should also provide with ladder and Lightning Arrestor. 24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP. 25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The control panel should  show at least temperature in both the primary and secondary rooms and injectors of the filters and load.    26.Each system should be provided with alarm system for any breakdown or defect of any component of the system. 27.The following personal protective tools must be provide: a.Heat resistant garments for 20 persons. b.Heat resistant goggles for 20 persons. 28.All components of each system should be painted with silver color that is heat resistant.

Hazardous Waste to be Incinerated

Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicalsfor water purification and photographic consumables and plastic material, emptyplastic/metal cans that still contain remnant hazardous material, oil absorbent. Hazardous liquid chemical:Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-lessSolvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic andCompressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, airrefresh spray and other similar chemicals. Contaminated fuel:Mainly diesel or gasoline contaminated by water or solvents. Used and/or Contaminated oil: Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motorand gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%). Contaminated water: Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate. Contaminated soil: Soil polluted by oil, fuel or 11 chemicals.Contaminated soil polluted by chemicals that has to be recycled in landfill.Contaminated soil—treated and replaced on site. Oil Contaminated SolidsRags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials. Electronic waste: Waste electrical or electronic appliances or assemblies, including printed circuit boards,containing toxic material and/or heavy metal and/or emitting low radiation. Used battery cells: Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containingmaterials that are hazardouy. Used lead-acid batteries:Waste lead-acid batteries, rained/un-drained, and whole or crushed. Hazardous medical waste: Clinical and related waste, arising from medical, nursing or similar practices and wastegenerated in clinics during the investigation or treatment of patients (bio hazard). Expired drugs, solid: Waste pharmaceuticals, drugs and medicines, including sensitive medicines.Expired drugs Iiquid: Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medicalgrease, and paraffin based xpired medicines. Expired and/or contaminated fod: Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food) Onsite Training and Assem Option for Industrial Incinerators I. The bidders should includ 1a price in their offer for training in a central location ( Goma orBukavu) approximately 15 staff in the operation and maintenance of theequipment. Smart Ash Incinerators 1. Size requirement for the incinerators is that the unit works with a 55 gallon open endedsteel drum.2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J4. Each unit should come witH two steel drums, so that a spare drum is available. Spare Parts OptionIf there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii.  Secondary chamber 2 seconds @ 850°C   The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel  sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate  insulation and a hot face combination of super duty brickwork or high strength castable.   The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.   One Manual Load Incinerator comprising:   •         Manual Loading door …

hiclover.com macau pet cremation incinerator

Presently, we supply different series for local customer requirements and design  updated incinerator with our leading technology. The updated design feature  of our range of incinerators make them one of the most cost effective in the world. Key Features: * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime.  * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day. * PLC Control Plane for Intelligent operation.  * New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock. It features unique and advanced merits with compact size, high burning effect,  reasonable burning technology, high degree of non-harm etc.It is an ideal  choice for waste treatment of hospitals, hotels and various areas. Features: (1)   Gasifiedpyrolysis incineration is used for burning many kinds of waste.(2)   Waste can be burned once everyday by gasified incineration.(3)   Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust,dioxin etc.(4)   Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution. (5)   Compact structure and small land occupation. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: [email protected][email protected]   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 …

Smaller cremators incinerators

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.

Average 10kgs per hour incinerator for small hospital

This equipment quality structural for kinds of site, like hospital, environmental department,  animal cremation agencies, etc.  HICLOVER Incinerator supply updated models with dual combustion chamber,  mix-combustion chamber and smoke filter  chamber with refractory lines, and the combustion chamber temperature up to 1200 …

DOUBLE CHAMBER INCINERATOR

DOUBLE CHAMBER INCINERATOR Item No 1-Incinerator Model A  Burn rate 65kg/h minimumSecondary Chamber YesGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 850˚CBurn rate 150kg/h minimumSecondary Chamber YesGas Retention Time 2 secondsFuel Diesel/LPG/LNG Power Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 920˚CBurn rate 250kg/h minimumSecondary Chamber YesGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 920˚CBurn rate 150kg/h minimumSecondary Chamber YesGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 1200˚CBurn rate 50kg/h minimumGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 850˚CBurn rate 100kg/h minimumGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature 850˚CBurn rate 100kg/h minimumGas Retention Time 2 secondsFuel Diesel/LPG/LNGPower Supply for Control Box 220V-240V 50Hz single phaseMinimum Operating Temperature …

Top Feeding Door Solid Waste Incinerators HICLOVER

HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1 section or  3 sections) Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: [email protected][email protected]   Nanjing Clover Medical Technology Co.,Ltd. Items Side Loading Door …

Baghouse filter in a circular design, with automatic pulse-jet cleaning system of the filter bags

Baghouse filter in a circular design, with automatic pulse-jet cleaning system of the filter bags Temperature of ashes: 25oC with 60% RH The filter shall operate with compressed air at 2-4 bar Th baghouse filter shall be composed of a top section, filters section and bottom cone Top Section: Execution with flat cover, flanged onto the filter top. Including: Pulse jet cleaning system, clean-air outlet, and tube sheet. The filter bags are cleaned in rows by means of detachable blast pipes with high-efficient jet nozzles. Clean-air outlet. Tube sheet for installation of bags between dust- and clean-air chamber. Electronic differential pressure gauge, indicating the differential pressure across the filter bags. Electronic differential pressure control for jet pulsing at dP demand. Pneumatic Control Compressed-air receiver with solenoid valves (IP65). Filter regulator with automatic water separator and drain cock incl. fittings for mounting on the compressed-air receiver. Filter Chamber, including:  Inlet at the top of the chamber (for down-flow filtration) and inspection door. Filter Cages: The filter cages are manufactured of 5 mm round-bar steel, with shaped sheet bottom, and top with a circlip ensuring a quick mounting Filter Bags: Filter bags with a sewn-in bottom and a stainless snap ring for fastening. Filter bags material to be PTFE or Polypropylene to withstand corrosive ashes  A spare set of filter bags to be quoted with the complete system Bottom Cone, below filter chamber Including cleaning door and supporting brackets on cone Safety switch on inspection doors Support frame for outdoor installation Service platform, for positioning by inspection door, with handrail and access through the bottom. With ladder. Rotary valve,  ATEX (inside/outside) Zone 20/Zone 22 Pressure-shock resistance (Explosion): 2 bars With a Centrifugal fan: duty point of 2,000 cfm at 2700 Pa All installation to be outdoor: IP rating for any electrical to be for outdoor installation Power: 230V/1Ph or 380V/3Ph, 50 Hz

INCINERATORS AND ADDITIONAL EQUIPMENT

    minimum technical requirements   Item 1 Incinerator model A   Burn Rate 65kg/h minimum   Weight (kg), please indicate:   Secondary Chamber   Gas Retention Time – 2 Seconds   Fuel – Diesel/LPG/LNG, please indicate   Power Supply for Control …

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2                                                             Spare part list – After burners                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2 Spare part list – Ram loader                           Item description                   N0 of required                         Reed switch                               4                        Seal kit                                       1      Medical waste incinerator Accessories  – Clean out tools – Loading and ash removal methods.      – Fuel storage tank with the two pump and all accessories.  – Flue gas cleaning system – Stack discharge. –      Medical waste incinerator civil work – Construct incinerator foundation     – Provide stack support     – Provide open steel structure room for the incinerator.     Medical waste incinerator submittal shall include:- -Detail installation drawing – Incinerator and auxiliary product data      – Test reports      – Certificates like CE, ISO, LR, AFNOR, TUV and UL.      – Energy analysis report …

INCINERATORS AND ADDITIONAL EQUIPMENT

    minimum technical requirements   Item 1 Incinerator model A   Burn Rate 65kg/h minimum   Weight (kg), please indicate:   Secondary Chamber   Gas Retention Time – 2 Seconds   Fuel – Diesel/LPG/LNG, please indicate   Power Supply for Control …

Rwanda Waste Management Incinerator Solutions with HICLOVER

Rwanda Waste Management Incinerator Solutions with HICLOVER Rwanda has made significant progress in improving environmental infrastructure, yet hospital waste management remains a priority area. The government and donor agencies continue to fund projects to provide modern Rwanda waste management incinerator systems for …

incinerator technical request

Cyclone separator Electrostatic precipitators Fabric filters 6 Chimney / Stack 1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account. 2. If possible the chimney should be visible to the operator from the feeding area. 3. The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable. 4. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed  x 2) whichever is higher to ensure no down washing of exiting gases. 5. Point for the measurement of emissions shall be provided. 7 Instrumentation Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers. 2. An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the  required temperature. 3. In addition to the above the following instruments may also be required. A carbon monoxide and/or oxygen meter/recorder A smoke density meter/recorder A gas flow meter/recorder A solid particulate meter/recorder Any other instrument or measurement that may be considered necessary 8 Emission Limits 1. Combustion efficiency: Combustion efficiency (CE) shall be at least 99.00% The Combustion efficiency is computed as follows; C.E= % CO 2 x 100 % CO2 + CO 2. The temperature of the primary chamber shall be 800 ± 50o C 3. …